BWTS Form

Ballast Water Treatment System Form

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Contact Information

Vessel Particulars

Cargo Hold(s) Used for Ballast?*
in cubic meters (m3)
Only include vessels if Total Ballast Capacity, Number of Ballast Tanks, and Voyage Details (Section 3) are similar.
Does the vessel have hazardous areas?*

Voyage Details

The Scienco® InTankTM BWTS treats ballast water during the voyage, defined as the time between ballast water uptake and planned ballast water discharge. Ballast water is NOT treated during uptake or discharge. Sizing the InTank BWTS requires declaring a single voyage duration that will determine equipment size and cost. The longer the voyage duration, the smaller and less cost the equipment. Please identify vessel's Shortest Ballast Voyage (SBV) below. SBVS are typically 48 hours for coastal operators and 120 hours for transoceanic operators. The minimum SBV is 36 hours. An alternative SBV may be also be designated to determine trade between voyage duration limitations and equipment sizing and pricing.

Hours
Hours

Options & Optional Equipment

Type of Treatment Module Requested:*
-EC: Disinfectant is generated onboard using seawater -BC: Disinfectant must be loaded into holding tank -Having both EC and BC Modules provides redundancy and greater system flexibility over a range of voyage durations
Are you interested in the InTankTM BWTS Container Option?*
- Equipment is normally installed below deck. With this option, equipment is installed in a container that is mounted on deck.
Can be installed in remote locations for full functionality or display only.